Residetial Projects  
 
 

Construction Status - Coral Ennar

        


Block - C&D (Front Elevation)


Block - A


Block - A&B

 

Phase - I


Block - J&K


Block - G&H (South side Elevation)

 

Phase - II


Block - E (North side Elevation)


Block - E

 

F1b Flat (Putty Work)


Block - F (Terrace)


Block - E (Terrace)

 

Ennar - View


Block - F (Putty Work)


Block - F (Front Elevation)

 

Block - J&K


Block - C&D (Terrace Floor)


Block - C&D (OTS)

 

Block - J&K


C1d Flat


Block - A&B (Front Elevation)

 

Block - A (Kitchen Platform)


Block - A (Putty Work)


Block - A&B (OTS)

 

Block - A (Floor Tile)


Toilet - Wall Tile (Block - A)


Toilet - Wall Tile (Block - B)

 

A1c Flat


Block - A (Plumbing Work)